The mobile no . 7 signaling network of 2 mbit s high speed signaling link 高速信令鏈路架構(gòu)移動通信七號信令網(wǎng)
Signaling link manager slm 信令鏈路管理程序
Active signaling link 激活信令鏈路
Test specification for no . 7 signalling system - the ambit s high speed signalling link No . 7信令系統(tǒng)測試規(guī)范- 2mbit s高速信令鏈路
This layer defines the physical , electrical , and functional characteristics of the signaling links connecting ss7 components 這一層定義了連接ss7組件的信令鏈路的物理的、電氣的和功能性特征。
The pre - determined path , consisting of a succession of signalling points / signalling transfer points and the interconnecting signalling links , that a message takes through the signalling network between the origination point and the destination point is the signalling route for that signalling relation 信令路由是從源信令點到達(dá)目的信令點所要經(jīng)過的預(yù)先確定的信令消息傳送路徑,包含一系列信令點/信令轉(zhuǎn)接點及他們之間的互聯(lián)信令鏈路。
At present , we can track the signaling links in the 155 mbs ports of a switch only by using the signaling of the switch itself rather than the external analyzer of the ccs 7 . this causes inconvenience to maintenance . it is expected that manufacturers will enhance the tracking and monitoring functionality of their products and training switching and maintenance personnel concerning routine maintenance of the 155 mbs port 目前,我們只能利用交換機(jī)本身的信令觀察手段對交換機(jī)155mbits端口中的信令鏈路進(jìn)行跟蹤、分析,而不能通過外掛七號信令分析儀對信令進(jìn)行監(jiān)測,給維護(hù)工作帶來了不便,有待于生產(chǎn)交換機(jī)的廠家加強(qiáng)這方面的功能。
Due to a & b double flats setting of stp ( signalling transfer point ) in different place , and working on mode of payload - sharing on signalling links ( couple links ) between sp ( signalling point ) and stp , the calling signalling sequence cannot be collected completely from single stp . thus it is difficult to synthesize signalling affair in the signalling supervision system . the first , this thesis illuminateds network architecture of no . 7 signalling network and no . 7 signalling centralized supervision system 由于七號信令網(wǎng)的信令轉(zhuǎn)接點設(shè)備stp ( signallingtransferpoint )采用a 、 b雙平面異地設(shè)置,下一級的信令點設(shè)備sp ( signallingpoint )至上一級的一對stp之間的信令路由采用負(fù)荷分擔(dān)方式工作, sp至stp對的負(fù)荷分擔(dān)鏈路形成耦合鏈路,導(dǎo)致在一個stp處無法采集到完整的呼叫信令序列,這樣就給監(jiān)測系統(tǒng)核心部分之一的信令事件合成帶來了極大的難度。